1.Introduction As China’s first floating production platform in ultra-deepwater,the“Deep Sea No.1”energy station is a milestone in China’s deepwater resource utilization.The energy station is located in the LS17-2...1.Introduction As China’s first floating production platform in ultra-deepwater,the“Deep Sea No.1”energy station is a milestone in China’s deepwater resource utilization.The energy station is located in the LS17-2 gas field,150 km off the southeast coast of Hainan Island,China.It is a semi-submersible platform(Fig.1)with a displacement of 101 thousand tonnes and an operational draft of 35 to 40 m.The platform is permanently moored in 1422 m water by 16 chain-polyester-chain mooring lines in a 4×4 pattern,and six steel catenary risers(SCRs)are attached to the platform.It is the world’s first and only semi-submersible platform with the function of condensate storage,so it can be regarded as a floating production storage and offloading(FPSO)unit.With the ability to produce 3 billion m3 of natural gas each year(enough for over 10 million families),the Deep Sea No.1 energy station is a key step toward China’s energy independence.The LS17-2 gas field,where the Deep Sea No.1 energy station is located,was discovered in 2014.Plans for its development were made in 2015,followed by research and a preliminary design.Deep Sea No.1 went into operation on June 25,2021,and will operate onsite continuously without dry-docking for 30 years.展开更多
This paper presents a multi-module oscillating water column(OWC)wave energy converter(WEC)array system,comprising seven interconnected OWC modules.The modules are connected by elastic ropes with clumped weights positi...This paper presents a multi-module oscillating water column(OWC)wave energy converter(WEC)array system,comprising seven interconnected OWC modules.The modules are connected by elastic ropes with clumped weights positioned at the ropes'midpoints.Three distinct mooring systems are designed for this OWC array,and the impact of mooring configurations on the hydrodynamic responses of the OWCs and mooring tensions is thoroughly examined.Three-dimensional potential flow theory is applied to perform time domain analyses.The motion responses of representative modules,the tension of specific mooring lines,and the spacing between adjacent modules in the array system are investigated through a comprehensive coupled dynamic analysis in the time domain.Based on these analyses,recommendations are provided for the optimal mooring system configuration for the array system.展开更多
Logistical supply is costly for the deepwater oil and gas exploitation, thereby it is necessary to develop a novel power supply solution to improve the offshore structure’s self-holding capacity. The two-body point a...Logistical supply is costly for the deepwater oil and gas exploitation, thereby it is necessary to develop a novel power supply solution to improve the offshore structure’s self-holding capacity. The two-body point absorbers, as a renewable energy device, have achieved a rapid development. Heave plate is used to constrain the truss’ s motion in the two-body point absorber, and the floater moves along the truss up and down. This two-body point absorber can be considered to be an essentially mass-spring-damper system. And it is well known that the heave plates have been widely used in the Spar platform to suppress the heave motions. So if the two-body point absorber can be modified to combine with offshore floating structures, this system can not only offer electric power to support operations or daily lives for the platform, but also control the large motions in the vertical plane. Following this concept, a novel tuned heave plate(THP) system is proposed for the conventional semi-submersible platform. In order to investigate the dynamic performances of the single THP, two experiments are conducted in this paper. First, the hydrodynamic coefficients of the heave plates are studied, and then the THP experiments are carried out to analyze its dynamic performance. It can be concluded that this THP is feasible and achieves the design objective.展开更多
摘要1.Introduction As China’s first floating production platform in ultra-deepwater,the“Deep Sea No.1”energy station is a milestone in China’s deepwater resource utilization.The energy station is located in the LS17-2 gas field,150 km off the southeast coast of Hainan Island,China.It is a semi-submersible platform(Fig.1)with a displacement of 101 thousand tonnes and an operational draft of 35 to 40 m.The platform is permanently moored in 1422 m water by 16 chain-polyester-chain mooring lines in a 4×4 pattern,and six steel catenary risers(SCRs)are attached to the platform.It is the world’s first and only semi-submersible platform with the function of condensate storage,so it can be regarded as a floating production storage and offloading(FPSO)unit.With the ability to produce 3 billion m3 of natural gas each year(enough for over 10 million families),the Deep Sea No.1 energy station is a key step toward China’s energy independence.The LS17-2 gas field,where the Deep Sea No.1 energy station is located,was discovered in 2014.Plans for its development were made in 2015,followed by research and a preliminary design.Deep Sea No.1 went into operation on June 25,2021,and will operate onsite continuously without dry-docking for 30 years.
基金financially supported by the National Natural Science Foundation of China(Grant Nos.52301322,52025112,and 52331011)Natural Science Foundation of Jiangsu Province(Grant No.BK20220653)。
摘要This paper presents a multi-module oscillating water column(OWC)wave energy converter(WEC)array system,comprising seven interconnected OWC modules.The modules are connected by elastic ropes with clumped weights positioned at the ropes'midpoints.Three distinct mooring systems are designed for this OWC array,and the impact of mooring configurations on the hydrodynamic responses of the OWCs and mooring tensions is thoroughly examined.Three-dimensional potential flow theory is applied to perform time domain analyses.The motion responses of representative modules,the tension of specific mooring lines,and the spacing between adjacent modules in the array system are investigated through a comprehensive coupled dynamic analysis in the time domain.Based on these analyses,recommendations are provided for the optimal mooring system configuration for the array system.
基金financially supported by the Fundamental Research Program of Shandong Province(Grant No.ZR2016EEQ23)the Youth Exploration Project of Shandong Province Mount Tai Scholar Advanced Disciplinary Talent Group
摘要Logistical supply is costly for the deepwater oil and gas exploitation, thereby it is necessary to develop a novel power supply solution to improve the offshore structure’s self-holding capacity. The two-body point absorbers, as a renewable energy device, have achieved a rapid development. Heave plate is used to constrain the truss’ s motion in the two-body point absorber, and the floater moves along the truss up and down. This two-body point absorber can be considered to be an essentially mass-spring-damper system. And it is well known that the heave plates have been widely used in the Spar platform to suppress the heave motions. So if the two-body point absorber can be modified to combine with offshore floating structures, this system can not only offer electric power to support operations or daily lives for the platform, but also control the large motions in the vertical plane. Following this concept, a novel tuned heave plate(THP) system is proposed for the conventional semi-submersible platform. In order to investigate the dynamic performances of the single THP, two experiments are conducted in this paper. First, the hydrodynamic coefficients of the heave plates are studied, and then the THP experiments are carried out to analyze its dynamic performance. It can be concluded that this THP is feasible and achieves the design objective.