期刊文献+
共找到1,558篇文章
< 1 2 78 >
每页显示 20 50 100
Knowledge map analysis of China's public participation in environmental governance PPP project using CiteSpace 认领 引用
1
作者 REN Zhi-tao QING Xue-ling +1 位作者 YANG Hao KANG Shi-qi 《Ecological Economy》 2023年第1期89-100,共12页
China’s public participation in environmental governance PPP projects has become a hot research issue.Based on the CiteSpace software,taking 1592 literatures collected by CNKI from 2000 to 2021 as samples,the paper v... China’s public participation in environmental governance PPP projects has become a hot research issue.Based on the CiteSpace software,taking 1592 literatures collected by CNKI from 2000 to 2021 as samples,the paper visually analyzes the literature timing,author distribution,institutional distribution,hot topics and evolution trends of Chinese public participation in environmental governance PPP project.After 20 years of development,the research focus of China’s public participation in environmental governance PPP project involves rural environmental governance,environmental diversification governance,regional environmental governance and environmental governance value-driven,and shows endogenous implicit drive and endogenous explicit drive.The multi-spiral characteristics of China’s public participation in environmental governance PPP coexist with endogenous implicit obstacles and exogenous implicit obstacles. 展开更多
关键词 environmental governance PPP project public participation knowledge map
暂未订购 下载PDF
Failure model of environmental PPP project based on extension matter-element theory 认领 引用
2
作者 REN Zhi-tao FU Hong-yu +3 位作者 GUO Ya GUO Lin-lin Patrick X.W.Zou WU Ji-ke 《Ecological Economy》 2022年第2期121-135,共15页
In recent years,with the global environmental pollution becoming more and more serious,and the widespread application of PPP model in various fields,PPP model provides a new solution for environmental governance.Howev... In recent years,with the global environmental pollution becoming more and more serious,and the widespread application of PPP model in various fields,PPP model provides a new solution for environmental governance.However,due to environmental management of PPP projects in practice by various factors,such as the lack of social value,organizational management confusion and consultation communication is not in place cause group events,resulting in the failure of the PPP project,and a large number of economic losses.Therefore,the objective of this paper is to ensure the smooth implementation of environmental management of PPP projects,to reduce the risk to avoid failure.The research methods adopted in this study include literature review and case analysis,based on the theory of environmental governance PPP,select 15 failure cases analysis failure reasons,identify environmental management PPP project’s 18 failure factors,starting from the government to enterprises.The index is divided into three dimensions:social system,organization and management,public behavior,and determination of failure measure index system.Based on the theory of the open matter,the failure measure model is established,and the failure factor index is measured and analyzed.The degree of failure of the project is clarified and the PPP project is analyzed by a sewage treatment to verify the reasonable model of the failure measure model.The feasibility of the future of environmental management PPP project failure risk provides a practical tool. 展开更多
关键词 PPP projects extension matter-element environmental governance
暂未订购 下载PDF
Research on the Financial Risk Management Mode of PPP Project 认领 引用
3
作者 PEIYanhua 《外文科技期刊数据库(文摘版)经济管理》 2022年第6期122-125,共4页
The so-called PPP project, also known as the Public-Private-Partnership project, as the name implies, is a project operation mode of cooperation between the government and social capital. At present, scholars, experts... The so-called PPP project, also known as the Public-Private-Partnership project, as the name implies, is a project operation mode of cooperation between the government and social capital. At present, scholars, experts and the public generally believe that the PPP project has important value and function. It can not only effectively solve various local debt problems, but also transfer risks to the direction of social capital, thus improving the efficiency of capital operation. However, it should be noted that not all public goods are used in the PPP model. Therefore, not all PPP models can improve the efficiency of capital use and reduce local debt. Moreover, there are obvious financial risks that will increase the financial pressure of local governments. In short, although the PPP model has positive financial significance, it needs strict and prudent control and attention to financial risk management. Only in this way can the role and value of the PPP model be brought into full play and be conducive to the overall development of domestic society and economy. Therefore, this paper will conduct systematic research and analysis on the financial risk management model of PPP project, the main purpose of which is to control the financial risk of PPP model. 展开更多
关键词 PPP project financial management financial risk management mode effective strategy research and
暂未订购 下载PDF
Research on the Decision Model to Stakeholders in PPP Projects 认领 引用
4
作者 ZHANG Wei 《International English Education Research》 2016年第4期90-92,共3页
Aiming at the public sector and the private sector in PPP projects as the research objects, the two core participants investment decision model is established by using option game thinking. First, based on the option ... Aiming at the public sector and the private sector in PPP projects as the research objects, the two core participants investment decision model is established by using option game thinking. First, based on the option game features PPP projects have, the paper proposes some research hypotheses on value, income, cost for the option. Second, on the basis of the decision path of a multi-stage binary tree model, respectively for the public sector and the private sector, the paper builds up utility functions, the cost-input model and the contract decision model. It indicates that by the use of growth options in the shortened contract period, the private sector can still ensure the construction quality of the PPP project. Finally, the validity of the model in the PPP project agreement and the investment decision process is verified by the case analysis. 展开更多
关键词 PPP projects Stakeholders Multi-stage Option game
暂未订购 下载PDF
Discussion on the Withdrawal of Capital Parties in PPP Projects 认领 引用
5
作者 WEI Wenjun 《外文科技期刊数据库(文摘版)经济管理》 2020年第2期071-073,共3页
According to the comprehensive information platform of the Ministry of finance, by the end of November 2020, since 2014, there have been 9954 warehousing projects with an investment of 15.3 trillion yuan, 6920 contrac... According to the comprehensive information platform of the Ministry of finance, by the end of November 2020, since 2014, there have been 9954 warehousing projects with an investment of 15.3 trillion yuan, 6920 contracted landing projects with an investment of 11.0 trillion yuan, with a landing rate of 69.5%, and 4188 construction projects with an investment of 6.4 trillion yuan, with an operating rate of 60.5%.With the gradual construction of PPP projects, a large number of PPP projects will enter the operation period, and investors will have exit demand for different reasons. This paper discusses the reasons, ways, policies and problems of social capital exit of PPP projects. 展开更多
关键词 PPP project exit reason exit way exit policy facing problems
暂未订购 下载PDF
Research on Tax Planning of PPP Projects in China: Based on the Perspective of Digital Economy 认领 引用
6
作者 Jiangyu Huang Kezhen Liu 《Journal of Finance Research》 2020年第2期128-134,共7页
The digital economy has become an important driving force for the growth of fiscal revenue in various countries.Tax planning is essential for the cost accounting of PPP projects,reducing corporate tax burdens,and incr... The digital economy has become an important driving force for the growth of fiscal revenue in various countries.Tax planning is essential for the cost accounting of PPP projects,reducing corporate tax burdens,and increasing company value.This paper adopts a case analysis method,taking the smart highway PPP project in Guizhou Province as an example.Through statistical analysis,it is found that the value-for-money and big data of the PPP project affects tax planning,the project’s value-added tax input and output items have time mismatches,and enterprises Income tax payment imbalance.In the context of the digital economy,the tax planning of China’s PPP projects can be further improved:digital transformation and big data to prevent tax risks caused by value for money evaluation;based on digital technology to improve the value-added tax deduction chain,and digital communication platforms to alleviate time mismatch of value-added tax;use big data to monitor and balance project portfolio investment;improve the level of digital skills of financial personnel. 展开更多
关键词 PPP project Tax planning Tax risk Digital economy
暂未订购 下载PDF
Discussion on Investment and Financing Management Strategies of PPP Project from the Perspective of Investors 认领 引用
7
作者 WEI Wenjun 《外文科技期刊数据库(文摘版)经济管理》 2021年第2期204-208,共5页
China has become the world's largest PPP market. Over the past few years, the development of the PPP industry has been on a roller coaster, first rushing up and then stopping abruptly. Today, the situation has imp... China has become the world's largest PPP market. Over the past few years, the development of the PPP industry has been on a roller coaster, first rushing up and then stopping abruptly. Today, the situation has improved and the "Standardized and Orderly Promotion of Cooperation between Government and Social Capital (PPP)" has been included in the "14th Five-Year Plan" and the long-term target for 2035. The advantage of PPP is to enable partners to achieve more favorable results than expected by acting alone: less government spending and less investment risk for enterprises. This paper analyzes the investment and financing management strategies of PPP projects from the perspective of investors for reference. 展开更多
关键词 PPP project investment requirements financing requirements financing proposal
暂未订购 下载PDF
Analysis on Performance Evaluation of PPP Project for Comprehensive Improvement of Water Environment during Operation Period 认领 引用
8
作者 LIN Jing 《外文科技期刊数据库(文摘版)自然科学》 2021年第11期023-025,共3页
The most indispensable branch in the ecosystem is the water environment, whose high-quality development directly affects the stability of the whole ecosystem. With the official release of "Action Plan for Water P... The most indispensable branch in the ecosystem is the water environment, whose high-quality development directly affects the stability of the whole ecosystem. With the official release of "Action Plan for Water Pollution Prevention" in our country, the comprehensive management of water environment in our country has a long way to go. The comprehensive improvement of water environment is of typical public welfare. In the past, the government was the core. Under normal circumstances, the government faced huge financial pressure, and the single government management reduced the efficiency of project implementation. PPP model is a new way to deal with this problem. In this environment, the government and the society can jointly create a "benefit sharing and risk sharing" consortium to reduce the amount of funds invested by the government in a short period of time. At the same time, the special technical advantages of social capital can be brought into play to speed up the operation of the project. Since 2018, the Ministry of Finance and the National Development and Reform Commission have implemented a large-scale project library clean-up and rectification action. The increasingly strict warehousing review and dynamic supervision of the whole process have become the main theme of PPP project management, thus promoting the return of PPP to rationality and normality. Performance evaluation is an indispensable key part of the whole process of standardized management of PPP projects. This paper combines the characteristics of the water environment comprehensive management PPP project and the interests needs of all participants in the project, constructs the performance evaluation system of the PPP project, and makes a reasonable evaluation of the project performance with examples, which lays a theoretical foundation for the water environment comprehensive management PPP project to serve the society effectively. 展开更多
关键词 water environment comprehensive remediation PPP project operating period performance evaluation a
暂未订购 下载PDF
Discussion on the Financing Management of PPP Project Funds 认领 引用
9
作者 WU Yuanzhen 《外文科技期刊数据库(文摘版)经济管理》 2021年第10期015-017,共3页
At present, with the rapid development of society and the gradual improvement of economic level, there are fewer and fewer traditional construction projects, and many projects are implemented in the form of PPP, which... At present, with the rapid development of society and the gradual improvement of economic level, there are fewer and fewer traditional construction projects, and many projects are implemented in the form of PPP, which is also a symbol of the continuous development of society. However, many state-owned construction enterprises do not realize the importance of PPP projects in the investment process, and focus a lot of energy on the traditional investment and financing model. The lack of experience in PPP projects and the lack of understanding of project operation have resulted in the poor quality of successful projects and the inability to carry out follow-up work, affecting the development of state-owned enterprises. This paper specifically analyzes and studies the investment and financing management strategies of PPP projects of construction enterprises for reference. 展开更多
关键词 construction enterprise PPP project investment and financing management strategies discussed
暂未订购 下载PDF
Research on Enterprise Avoiding Financial Risk in PPP Project 认领 引用
10
作者 JIANGAnguang 《外文科技期刊数据库(文摘版)经济管理》 2022年第6期053-056,共4页
As a new means of cooperation, PPP model can break the time and space restrictions, effectively promote the diversified development of investors, and has the characteristics of wide application range, which can provid... As a new means of cooperation, PPP model can break the time and space restrictions, effectively promote the diversified development of investors, and has the characteristics of wide application range, which can provide more diversified investment and financing channels for infrastructure construction projects. PPP project model plays a vital role in the construction process of public service facilities in China. Taking the meaning, characteristics and advantages of PPP model as the starting point, this paper analyzes the types of financial risks of enterprises in PPP projects and the problems in financial risk management, and puts forward some targeted avoidance measures. 展开更多
关键词 PPP project financial risk avoid
暂未订购 下载PDF
Application of BIM Technology in the Transformation of PPP Project Investment Management 认领 引用
11
作者 LILuqiang 《外文科技期刊数据库(文摘版)工程技术》 2022年第9期023-027,共5页
BIM technology, as an important technical means in the field of modern architecture in China, plays an important role in the transformation of PPP project investment management. Scientific application of BIM technolog... BIM technology, as an important technical means in the field of modern architecture in China, plays an important role in the transformation of PPP project investment management. Scientific application of BIM technology will help to improve resource integration in PPP project construction, speed up construction budget and investment management, ensure effective control of construction progress, effectively carry out PPP project construction and improve the development level of modern architecture in China. 展开更多
关键词 BIM technology PPP project investment management transformation
暂未订购 下载PDF
公共体育PPP项目落地影响因素的社会网络分析研究 认领 引用 被引量:1
12
作者 刘晓虎 潘佳玲 +1 位作者 简兆栋 陈长洲 《大理大学学报》 2026年第1期92-101,共10页
公共体育领域与PPP合作模式的有效融合,能充分发挥市场驱动运营与政府职能配置能力,是当下体育公共服务发展升级的最优解,但因PPP项目投资金额、合作时长等自身特点及现阶段政策与经济发展不对称因素,公共体育PPP项目在现实推进中仍存... 公共体育领域与PPP合作模式的有效融合,能充分发挥市场驱动运营与政府职能配置能力,是当下体育公共服务发展升级的最优解,但因PPP项目投资金额、合作时长等自身特点及现阶段政策与经济发展不对称因素,公共体育PPP项目在现实推进中仍存在项目落地效率较低的问题。本研究通过文献调研法与专家调查法对公共体育PPP项目落地影响因素进行识别归纳并构建影响因素类别框架,采用社会网络分析法从个体节点及整体网络层面对公共体育PPP影响因素网络进行分析,借助中心性及块模型等具体指标综合分析,得出包括投资金额和回报方式在内的6个关键影响因素及相关影响路径。基于此,本研究结合公共体育PPP项目关键影响因素和关键影响路径提出相应的项目落地路径优化建议:提升财政支出占比,健全区域政策支持;整合区域资源优势,建立人才梯队模式;把握投资金额尺度,优化项目回报机制。 展开更多
关键词 社会网络分析法 公共体育 PPP项目 落地影响因素
暂未订购 下载PDF
基于体育PPP项目融资的体育场地设施金融支持创新实践 认领 引用
13
作者 江涵逸 冯晓露 《体育学刊》 CAS CSSCI 北大核心 2026年第3期76-85,共10页
采用文献资料、专家访谈、实地调查等方法,基于体育PPP项目融资实践,探索体育场地设施金融支持创新的价值逻辑、制约因素与治理策略。研究解构我国体育场地设施PPP项目融资基本模式,并总结其创新价值逻辑:通过社会资本参与,实现公共体... 采用文献资料、专家访谈、实地调查等方法,基于体育PPP项目融资实践,探索体育场地设施金融支持创新的价值逻辑、制约因素与治理策略。研究解构我国体育场地设施PPP项目融资基本模式,并总结其创新价值逻辑:通过社会资本参与,实现公共体育场地设施融资依赖转向的多重赋能;通过SPV组建,以政治关联缓解体育场地设施风险性与流动性困局;通过多主体协同,以体育场地设施价值共创网络重构助推信用增级。研究认为,体育PPP项目融资存在宏观环境(PPP项目政策环境未稳定、体育金融体系不健全)、项目自身(价值平衡需求下的收益风险错配、主体增信效能与融资渠道有效供给不足、政治关联“双刃剑”效应)、关联方(关联方融资专业性多重约束、金融机构权利的结构性冲突)等层面的制约因素。基于此,提出体育场地设施金融支持创新的治理启示:重塑配套政策指引,加强制度精准保障;完善体育金融体系,拓宽产融合作渠道;加强金融机构权利保障,优化生产要素协同赋能;健全收益限制调控机制,强化风险匹配创新支持;鼓励体育空间融合再生产,推动场景金融生态圈嵌入。 展开更多
关键词 体育产业 体育场地设施 金融支持 体育PPP项目融资
暂未订购 下载PDF
环境治理PPP项目政府管控要素协同的系统动力学仿真研究 认领 引用
14
作者 任志涛 方大伟 《天津城建大学学报》 CAS 2026年第1期38-44,共7页
宏观公共管理方式已成为环境治理PPP项目的新焦点,而政府是否能够明晰要素关系并合理管控是环境治理PPP项目既定目标实现的关键.立足于复杂适应系统理论,在系统分析环境治理PPP项目政府管控协同的基础上,沿系统关键变量识别、因果反馈... 宏观公共管理方式已成为环境治理PPP项目的新焦点,而政府是否能够明晰要素关系并合理管控是环境治理PPP项目既定目标实现的关键.立足于复杂适应系统理论,在系统分析环境治理PPP项目政府管控协同的基础上,沿系统关键变量识别、因果反馈关系描述、系统流图绘制的技术路线,构建环境治理PPP项目政府管控要素协同的系统动力学模型,并结合仿真模拟法剖析要素协同发展的演变路径.研究结果表明:环境治理PPP项目政府管控要素协同是复杂系统演化的核心驱动力;单独优化单一参数时,不会改变环境治理PPP项目政府管控子系统的协同状态;而同时优化项目有效投资、知识存量与政府治理能力是实现环境治理PPP项目政府管控要素协同的最优路径. 展开更多
关键词 环境治理PPP项目 政府管控 要素协同 系统动力学模型
暂未订购 下载PDF
基于演化博弈视角公立医院PPP项目融资优化研究 认领 引用 被引量:2
15
作者 杨奕乐 郑尊信 罗维军 《系统管理学报》 CSSCI CSCD 北大核心 2026年第1期85-98,共14页
随着医疗改革的不断深化,公立医院仅依赖政府的财政支持已难以维持其运营与发展,亟须拓展新的资金来源与投资方式。PPP项目通过引入社会资本,为公立医疗机构项目建设提供了可行的资金解决方案。本文基于有限理性假设,构建了政府、社会... 随着医疗改革的不断深化,公立医院仅依赖政府的财政支持已难以维持其运营与发展,亟须拓展新的资金来源与投资方式。PPP项目通过引入社会资本,为公立医疗机构项目建设提供了可行的资金解决方案。本文基于有限理性假设,构建了政府、社会资本方与公立医院三方演化相位图及博弈模型,对各参与主体的策略选择进行分析;同时通过数值仿真,深入考察了不同初始条件下三方的策略选择以及关键参数变化对演化结果的影响。研究结论可为提升公立医院建设管理水平、优化公共服务质量及提高投资效益提供理论参考。 展开更多
关键词 公立医院 PPP项目 融资 演化博弈 仿真分析
暂未订购 下载PDF
利用专项债券化解存量水务PPP项目资金困境的路径研究 认领 引用
16
作者 张觅 《中国环保产业》 2026年第4期20-24,共5页
2025年8月,《国务院办公厅转发财政部〈关于规范政府和社会资本合作存量项目建设和运营的指导意见〉的通知》(以下简称《通知》)出台,为地方政府运用专项债券支持存量政府和社会资本合作(PPP)项目提供了明确的政策依据。本文结合《通知... 2025年8月,《国务院办公厅转发财政部〈关于规范政府和社会资本合作存量项目建设和运营的指导意见〉的通知》(以下简称《通知》)出台,为地方政府运用专项债券支持存量政府和社会资本合作(PPP)项目提供了明确的政策依据。本文结合《通知》的政策导向及当前水务行业存量PPP项目面临的资金困境,系统分析了专项债券支持存量水务PPP项目的三种典型路径—提前终止项目并支付价款、补充存量在建项目资金来源、置换存量运营期项目建设成本,并结合乌海市生态建设、赤峰市存量PPP项目合规降本及A市生态水系综合治理等实操案例进行细节拆解。同时,结合云南、内蒙古等地专项债券支持存量项目的最新实践,提出专项债券支持存量水务PPP项目的实操建议,以期为行业提供参考。 展开更多
关键词 专项债券 存量PPP项目 水务行业 合规路径
暂未订购 下载PDF
PPP存量项目优化盘活路径浅析 认领 引用
17
作者 王彬 《建筑经济》 2026年第6期57-60,共4页
受前期政策不完善、地方政府操作不规范、市场环境变化等多重因素影响,我国部分PPP存量项目在建设、运营、财政、融资、管理等方面暴露出诸多问题,制约项目可持续发展。本文结合相关政策及各地实践经验,分析PPP存量项目现状与核心问题,... 受前期政策不完善、地方政府操作不规范、市场环境变化等多重因素影响,我国部分PPP存量项目在建设、运营、财政、融资、管理等方面暴露出诸多问题,制约项目可持续发展。本文结合相关政策及各地实践经验,分析PPP存量项目现状与核心问题,从分类处置、融资优化、运营提升、财政保障、机制完善五个维度,构建多元化优化盘活路径,并提出针对性建议,为PPP存量项目规范管理、风险化解及高质量发展提供参考。 展开更多
关键词 PPP存量项目 优化盘活 分类施策 融资创新 运营提质
暂未订购 下载PDF
基于AHP法的生态水系综合治理PPP项目后评价实证研究 认领 引用
18
作者 唐超 张彦 +1 位作者 王浩 林瑞刚 《建筑经济》 2026年第7期88-95,共8页
以生态水系综合治理PPP项目为研究对象,采用“方法应用—模型构建—实例验证”的思路,结合AHP法与后评价理论,构建“目标层—准则层—子准则层—指标层”的四级后评价指标体系。通过专家打分构造判断矩阵,经权重计算与一致性检验(CR<... 以生态水系综合治理PPP项目为研究对象,采用“方法应用—模型构建—实例验证”的思路,结合AHP法与后评价理论,构建“目标层—准则层—子准则层—指标层”的四级后评价指标体系。通过专家打分构造判断矩阵,经权重计算与一致性检验(CR<0.1),建立加权求和综合评价模型,选取典型项目开展实证研究。结果表明,所建指标体系与评价模型具备良好通用性与有效性。典型项目综合得分6.85分,评价等级为良好,精准识别出项目运营管理、合同履约等短板。研究完善了生态水系综合治理PPP项目后评价理论框架,为同类项目提供可复制范式,具有重要理论与实践价值。 展开更多
关键词 生态水系综合治理 层次分析法(AHP) 项目后评价 PPP模式 实证研究
暂未订购 下载PDF
新机制下影响民营企业参与PPP项目的多维组态路径——基于环保类项目的分析 认领 引用
19
作者 薛菁 《科技与经济》 2026年第2期96-100,共5页
收集全国投资项目在线审批监管平台上的环保类PPP项目资料,运用fsQCA方法探讨新机制实施后影响民营企业投资PPP项目的组态因素,研究发现企业实力是影响企业参与投资规模不大、特许经营期限较短的环保类项目的核心条件;企业实力和融资能... 收集全国投资项目在线审批监管平台上的环保类PPP项目资料,运用fsQCA方法探讨新机制实施后影响民营企业投资PPP项目的组态因素,研究发现企业实力是影响企业参与投资规模不大、特许经营期限较短的环保类项目的核心条件;企业实力和融资能力是推动民营企业参与投资额大或特许经营期限长的项目的核心条件;对于投资额大且特许经营期限长的项目,核心影响条件为“企业实力+融资能力+营商环境”。由此,提出合理筛选用于开展PPP合作的项目类型、创新支持民营企业参与PPP项目的融资产品、指导民营企业成为合格的社会资本方、打造支持民营企业参与PPP项目的营商环境等建议,进一步提高环保类PPP项目中民营企业的参与度。 展开更多
关键词 环保类PPP项目 民营企业 fsQCA
暂未订购 下载PDF
轨道交通PPP项目“运营转经营”现状及对策——以杭海城际铁路为例 认领 引用
20
作者 于丹 祁东印 白雨浛 《科技和产业》 2026年第5期137-145,共9页
从PPP(政府与社会资本合作)项目特点出发,深入剖析杭海城际铁路的运营现状。通过运用SWOT(优势、劣势、机会和威胁)理论,全面分析杭海城际铁路在机会、威胁、优势和劣势4个维度上的表现,并据此构建杭海城际铁路的SWOT矩阵。突破了传统... 从PPP(政府与社会资本合作)项目特点出发,深入剖析杭海城际铁路的运营现状。通过运用SWOT(优势、劣势、机会和威胁)理论,全面分析杭海城际铁路在机会、威胁、优势和劣势4个维度上的表现,并据此构建杭海城际铁路的SWOT矩阵。突破了传统的轨道交通运营模式,广泛借鉴了多家轨道交通企业的成功经验,同时紧密结合地方特色,创新性地提出4条转型路径,详细列出18种具体可行的运营转经营方案,并使用科学的方法建立通用评价体系,并利用评价体系进行评价,筛选出3种优秀、8种可行的方案。 展开更多
关键词 轨道交通 PPP(政府与社会资本合作)项目 运营转经营 SWOT(优势、劣势、机会和威胁)分析 层次分析法(AHP) 模糊综合评价法
暂未订购 下载PDF
上一页 1 2 78 下一页 到第
在线咨询 使用帮助 返回顶部 意见反馈